6 resultados para ASSEMBLY LINES

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design of a Final Assembly Line (FAL) is carry out in the product industrialization activity. The phase dealing with the definition of conceptual solutions is characterized by depending heavily on the personnel experience and being time-consuming. To enhance such process, it is proposed a development of a knowledge based software application to assist designers in the definition of scenarios and to generate conceptual FAL alternatives. Both the scenario and the generated FAL solution are part of the industrialization digital mock-up (IDMU). A commercial software application used in the aircraft programmes and supporting the IDMU concepts of: Product, Process and Resource; was selected to implement a software prototype. This communication presents the adopted methodological approach and the architecture of the developed application.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper presents an ant colony optimization algorithm to sequence the mixed assembly lines considering the inventory and the replenishment of components. This is a NP-problem that cannot be solved to optimality by exact methods when the size of the problem growth. Groups of specialized ants are implemented to solve the different parts of the problem. This is intended to differentiate each part of the problem. Different types of pheromone structures are created to identify good car sequences, and good routes for the replenishment of components vehicle. The contribution of this paper is the collaborative approach of the ACO for the mixed assembly line and the replenishment of components and the jointly solution of the problem.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The inbound logistic for feeding the workstation inside the factory represents a critical issue in the car manufacturing industry. Nowadays, this issue is even more critical than in the past since more types of car are being produced in the assembly lines. Consequently, as workstations have to install many types of components, they also need to have an inventory of different types of the component in a compact space. The replenishment is a critical issue since a lack of inventory could cause line stoppage or reworking. On the other hand, an excess of inventory could increase the holding cost or even block the replenishment paths. The decision of the replenishment routes cannot be made without taking into consideration the inventory needed by each station during the production time which will depend on the production sequence. This problem deals with medium-sized instances and it is solved using online solvers. The contribution of this paper is a MILP for the replenishment and inventory of the components in a car assembly line.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La presente Tesis persigue la definición y el desarrollo de un sistema basado en el conocimiento que permita la generación de modelos de líneas de montaje durante la fase conceptual de definición de una aeroestructura aeronáutica. Para ello, se propone la definición de un modelo formal del proceso en concurrencia asociado al diseño de líneas de montaje en la fase conceptual, y de un modelo de la estructura de datos básica para soportar dicho proceso. Ambos modelos sirven de base para el desarrollo de una aplicación de prueba de concepto en el entorno del sistema comercial CAX-PLM CATIA v5. Los modelos de línea generados integran las tres estructuras básicas definidas en el modelo propuesto: producto, procesos y recursos. Los modelos generados son estructuras “de montaje”, basadas en estructuras de producto “de fabricación” a su vez derivadas de estructuras “de diseño”. Cada modelo generado se evalúa en términos de cuatro estimaciones básicas: dimensiones máximas del nodo producto, distancia de transporte y medio a utilizar, tiempo total de ejecución y coste total. La generación de modelos de línea de montaje se realiza en concurrencia con la función diseño de producto, teniendo por tanto la oportunidad de influir en la misma e incluir requerimientos de fabricación y montaje al producto en las primeras fases de su ciclo de vida, lo que proporciona una clara ventaja competitiva. El desarrollo propuesto en esta Tesis permite sentar las bases para realizar desarrollos con objeto de asistir a los diseñadores durante la fase conceptual de generación de diseños de líneas de montaje. La aplicación prototipo desarrollada demuestra la viabilidad de la propuesta conceptual que se realiza en la Tesis. ABSTRACT The current thesis proposes the definition and development of a knowledge-based system to generate aircraft components assembly line models during the conceptual phase of the product life cycle. With this objective, the definition of a formal activity model to represent the design of assembly lines during the conceptual phase is proposed; such model considers the concurrence with the product design process. Associated to the activity model, a data structure model is defined to support such process. Both models are the basis for the development of a proof of concept application within the environment of the commercial CAX-PLM system CATIA v5. The generated assembly line models integrate the three basic structures defined in the proposed model: product, processes and resources. The generated models are “As Prepared” structures based on “As Planned” structures derived from “As Designed” structures. Each generated model is evaluated in terms of four basic estimates: maximum dimensions of the product node, transport distance and transport mean to be used, total execution time and total cost. The assembly line models generation is made in concurrence with the product design function. Therefore, it provides the opportunity to influence on it and allows including manufacturing and assembly requirements early in the product life cycle, which gives a clear competitive advantage. The development proposed in this Thesis allows setting the foundation to carry out further developments with the aim of assisting designers during the conceptual phase of the assembly line design process. The developed prototype application shows the feasibility of the conceptual proposal presented in the Thesis.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

AIRBUS Military has undertaken a project to implement the industrial Digital Mock-Up (iDMU) concept to support the industrialization process of a medium size aerostructure. Within the framework of a collaborative engineering strategy, such project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircrafts assembly lines. The project has confirmed the potential of the iDMU to improve the industrial design process in a collaborative engineering environment. This communication presents the main project objectives, the key methodological points, the main project achievements and the next additional developments to increase the scope and benefits of the iDMU concept.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Airbus designs and industrializes aircrafts using Concurrent Engineering techniques since decades. The introduction of new PLM methods, procedures and tools, and the need to reduce time-to-market, led Airbus Military to pursue new working methods. Traditional Engineering works sequentially. Concurrent Engineering basically overlaps tasks between teams. Collaborative Engineering promotes teamwork to develop product, processes and resources from the conceptual phase to the start of the serial production. The CALIPSO-neo pilot project was launched to support the industrialization process of a medium size aerostructure. The aim is to implement the industrial Digital Mock-Up (iDMU) concept and its exploitation to create shop floor documentation. In a framework of a collaborative engineering strategy, the project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircraft assembly lines. This paper presents the context, the conceptual approach and the methodology adopted.